Product Details:
|
Keywords: | Lightweight Cement Pouring Formwork Mesh Swimming Pool Construction | Sample: | Available And Small Size Free For New Customer |
---|---|---|---|
Length: | 2200mm | Service: | Online Technical Support |
Weight: | 11 Kg/sqm | Keyword: | Long Life, Easy Install, Anti Rust |
Packing: | Pvc Film+safety Belts+iron Pallet | Product Usage: | Building Construction |
Highlight: | Galvanized steel formwork mesh,Cement pouring pool mesh,Swimming pool stucco wire |
Attribute | Value |
---|---|
Keywords | Lightweight Cement Pouring Formwork Mesh Swimming Pool Construction |
Sample | Available and small size free for new customer |
Length | 2200mm |
Service | Online technical support |
Weight | 11 kg/sqm |
Keyword | Long life, easy install, anti rust |
Packing | PVC film + safety belts + iron pallet |
Product Usage | Building construction |
Cement pouring formwork structure is a lightweight, structural stay-in-place formwork system used to build reinforced concrete walls. It is composed of two filtering grids made of rib lath and reinforced by C-profiles. The grids are attached to each other with articulated rebar connectors.
Once Cement pouring formwork mesh is secured to the ground, concrete is poured inside. The excess water eliminates itself through the grids while the fluid concrete becomes semi-solid. The elimination of the excess water decreases pressure against the grids. We remains inside the structure and acts as reinforcement.
We constructions can be completed simply, rapidly and cost effectively with non-qualified labor.
Material | Galvanized steel |
Type | Cement Formwork Systems |
Length | 2800mm 2500mm 2200mm |
Product Weight | 11 kg/m2 |
Package | 10sheets/bundle 500 sheets/pallet |
Usage | Concrete constructions |
They can be used to build all types of concrete constructions:
Unlike traditional column and beam which takes 18 to 24 hours to install, our formwork only takes 3-4 hours. Due to this reason, it can reduce the construction time. In few days, workers whether they are qualified or not can be trained on the technology. Moreover, making structures from this formwork is less physically demanding than conventional ones. All of these things can help in dealing with the problem of labor shortage.
The panel is composed of two filtering grids made of rib lath reinforced by vertical stiffeners. The grids are connected by articulated rebar loops that fold for cost effective transport.
The two sides weight 11 kg/m2. It is composed of:
Rib Lath
Expanded metal with rib produced from commercial quality cold rolled and hot galvanized steel in accordance with ASTM C 847.
0.5 mm thickness.
C-Profiles
Produced from commercial quality cold rolled and hot galvanized steel in accordance with ASTM C 847.
0.6 mm thickness.
Connectors
Made from steel in coil grade B DIN 17 223 or equivalent.
20 mm width.
1.5mm thickness.
Longitudinal Rebar
Made from Fe 400 (French Norm) or equivalent.
500 N/mm2 elasticity limit.
700 N/mm2 traction strength.
5 mm diameter (minimum).
Founded in 2000, located in ANPING COUNTY, CHINA. Covering an area of 20000 sqm, specialized in architectural decorative mesh, construction building mesh, SS 304 fine filter mesh, walkway grating products.
With more than 15 years rich experience in this field. Velp has adopted modern management systems to ensure product quality.
Main markets: Australia, Germany, France, UK, Spain, Sweden, Switzerland, Norway, Italy, USA, Canada, Brazil, Panama, Middle East, Southeast Asia.
We sincerely believe that with superior products, reasonable price and comfortable services, we can cooperate well with every customer.
Contact Person: lisa
Tel: 18331803300